VCNY Group Limited 0203 908 0035 Free quote

Motorcycle & Cycle Parking

Motorcycle & Cycle Parking

Motorcycle bays and cycle parking areas defined on the surface — so two wheels stop occupying four wheel bays.

  • Bays sized for the vehicle, not the car
  • Positioned where they are actually used
  • Symbols and signage included
  • Free survey, set out drawing and a fixed price
  • The right material for the surface and the traffic
  • Marked overnight or in sections so you keep trading

Get your free quote

Free survey. Fixed price. No obligation. We reply the same working day.

Or call 0203 908 0035 — answered 24/7

We'll only use your details to reply. See our privacy policy.

Trusted by leading businesses across the UK and Ireland

Amazon McDonalds Greggs Holland and Barrett Holiday Inn Express Brewers Village Hotel Club Pets Corner

What Motorcycle & Cycle Parking covers

Layout and positioningAreas chosen for security, shelter and proximity to the entrance.
Motorcycle bay markingBays sized for motorcycles with space to manoeuvre.
Cycle parking areasAreas marked around stands and shelters.
Symbols and legendsSurface symbols so the area is unmistakable.
SignageUpright signage identifying the areas and any restrictions.
Stand coordinationCycle stands and anchors installed through the same group where needed.

Need this sorted quickly?

Leave a number and we'll call you straight back, or call us now, any hour of the day.

Or call 0203 908 0035

Set out before it is sprayed

Most line marking problems are set out problems. We measure the area, work out the layout that gives you the most from it, and agree it with you before anything permanent goes down.

1hr

Trafficable fast

Spray applied markings are normally driveable within the hour.

24/7

Nights and weekends

We work when your site does not, so trading is never interrupted.

28+

Years of experience

Combined experience across car parks, highways and internal floors.

1

Point of contact

One named contact from set out through to final sign off.

How it works

No drawn out procurement. Most jobs go from first call to a priced set out inside a week.

Step 1

Call or send the site details

Tell us the area and what it needs to do. A sketch or a photograph is plenty to start with.

Step 2

Free survey and set out

We measure, produce a set out and agree it with you before any permanent material goes down.

Step 3

Marked and handed back

Applied out of hours where needed, swept down and handed back — usually trafficable within the hour.

Recent line marking

Car parks, warehouse floors, highways and sports courts marked across the UK by our own teams.

8 recent projects
Freshly marked retail park car park with disabled bays and hatching

Car Park Marking

Durham

Professional car park line marking completed with precision and durability. Clear, well defined markings improve traffic flow, maximise parking capacity, enhance safety and create an organised, professional appearance for staff, visitors and customers alike.

Operative applying a 20mph speed roundel to a newly surfaced industrial estate road

Road Marking

Essex

Speed roundels and road markings installed for an industrial site project in Essex, improving traffic flow, reinforcing speed limits, enhancing safety, and providing clear, durable guidance for vehicles, staff and visitors.

Yellow warehouse floor marking defining pedestrian walkways, crossings and hatched zones

Internal Safety Marking

Nottinghamshire

Professional internal safety markings designed to improve workplace organisation, highlight hazards, define walkways and operational areas, and support safer movement throughout the facility, creating a clear, compliant and efficient working environment.

Freshly marked parking bays at a hotel car park

Hotel Car Parks

Nationwide

Nationwide hotel car park line marking delivered across the client's UK estate, providing consistent, high-quality markings that improve safety, traffic flow, parking organisation and overall appearance at every location.

Multi sports court markings applied to a sprung timber sports hall floor

Sports Court Marking

Leeds

Professional internal multi sports court marking, delivering precise, durable lines for clear gameplay and optimal performance. Designed to meet facility requirements while creating a safe, organised and professional sporting environment.

Yellow hatched keep clear markings applied to a newly surfaced access route beside a substation

Hatched Markings

Cumbria

Precision hatch marking applied to a newly surfaced tarmac area, creating clear, durable exclusion zones that improve site safety, traffic management, and overall organisation while delivering a professional high-quality finish.

New highway markings including a 30mph roundel, zigzags and double yellow lines

Highway Markings

Herefordshire

Professional highway marking complete with clear, durable lines and symbols to improve traffic flow, enhance safety and provide effective guidance for vehicles and pedestrians across multiple areas of roadway.

Reinstated centre line and double yellow markings on a residential street after works

Street Works Marking

Newcastle

Complete road marking project following street works, reinstating clear, precise, and durable markings to restore safe traffic flow, improve road safety and ensure the finished surface meets required standards.

Free quotation

Get in touch

Send us the site and the scope. We'll survey it at no cost and come back with a fixed, no obligation quotation, on the same day.

  • Free site survey, no obligation
  • Fixed price against a written scope
  • Same working day reply

Prefer to talk? 0203 908 0035

Request your quote

Tell us the site and what needs doing — we'll do the rest.

We'll only use your details to reply. See our privacy policy.

Common questions

How much space does motorcycle parking need?

Far less than a car bay — several motorcycles fit into a single car space, which is part of the attraction. What matters is manoeuvring room and a firm level surface.

Where should cycle parking go?

Close to the entrance, visible and ideally sheltered. Cycle parking tucked out of sight does not get used, because security is the main concern for cyclists.

Can you install the stands too?

Yes. Stands, anchors and shelters can be installed through the same group with the bases and fixings done properly.

How soon can we drive or walk on new markings?

Spray applied paint is normally trafficable within 30 to 60 minutes depending on temperature. Thermoplastic sets as it cools and is ready almost immediately. Two part resin takes longer and we will tell you how long when we quote.

Do you have to close the site?

No. We work overnight, at weekends or section by section so the site keeps operating. For retail, hospitality and distribution that is how we work as standard.

Is a site survey and quotation free?

Yes. Surveys, set out proposals and quotations are free and carry no obligation. We normally survey within a few working days and return a fixed price on the same day.

Do you cover the whole of the UK?

Yes, and Ireland. Regional teams cover single sites and national portfolios, including rolling marking programmes across an estate.

Get an instant quote today

Tell us the site and the demand. We'll survey it free of charge and come back with a layout and a fixed price.

Call now Free quote