VCNY Group Limited 0203 908 0035 Free quote

Demolition & Breaking Out

Demolition & Breaking Out

Breaking out slabs, structures and redundant hardstanding, with the waste crushed for reuse or removed under licensed carriage.

  • Slabs, structures and hardstanding
  • Crushing and reuse to cut disposal cost
  • Asbestos handled by licensed contractors
  • Free site survey and a fixed price against a written scope
  • Own plant, own teams, no subcontract chain
  • Setting out, test records and as built information

Get your free quote

Free survey. Fixed price. No obligation. We reply the same working day.

Or call 0203 908 0035 — answered 24/7

We'll only use your details to reply. See our privacy policy.

Trusted by leading businesses across the UK and Ireland

Amazon McDonalds Greggs Holland and Barrett Holiday Inn Express Brewers Village Hotel Club Pets Corner

What Demolition & Breaking Out covers

Survey and methodEstablishing what is there, including any asbestos, before anything is broken.
Soft stripRemoving fixtures, services and materials for segregated disposal or recycling.
Breaking outSlabs, foundations, walls and structures broken out with the right attachments.
Crushing and reuseMaterial crushed on site for reuse as fill, cutting disposal and import costs.
Waste removalLicensed carriage with transfer notes and segregation for recycling.
Making goodSite left level, safe and ready for whatever comes next.

Need this sorted quickly?

Leave a number and we'll call you straight back, or call us now, any hour of the day.

Or call 0203 908 0035

Why clients hand us the whole site

Groundworks set the levels every trade after you works to. Getting them right, and getting them right first time, is what keeps a programme intact.

1hr

Rapid response

Operatives on site within the hour for genuine emergencies, anywhere in the UK.

24/7

Always answered

A real person on the phone at any hour, every day of the year.

28+

Years of experience

Combined industry experience across groundworks, drainage and concrete.

1

Point of contact

One named contact from first survey through to final sign off.

How it works

No drawn out procurement. Most jobs go from first call to a priced scope inside a week.

Step 1

Call or send the drawings

Tell us the site and the scope. Send an engineer's drawing if you have one; a description is enough if you do not.

Step 2

Free survey and fixed price

We walk the site, check levels and services, then quote a fixed price against a written scope, on the same day.

Step 3

Built and documented

Delivered by our own teams and plant, then handed over with setting out records, test results and as built information.

Recent civil engineering

Trenching, drainage, concrete, kerbing and hardstanding delivered across the UK by the same teams and the same plant.

8 recent projects
VCNY mini excavator breaking out a trench for EV charging bay cable routes

Trenching Works

Birmingham

Trenching project for new EV charging bays, including excavation, cable routes, duct installation, bedding, backfilling, reinstatement, electrical infrastructure preparation, surface repairs and coordination for future charging point installations.

Open trench with new underground ducting laid, heras fencing alongside

Ducting Installation

Swansea

Trench excavation and installation of new underground ducting, including ground preparation, bedding, duct positioning, alignment, protection, temporary safety measures, backfilling preparation and reinstatement works.

Newly laid concrete forecourt slabs at a petrol station with drainage channel

Forecourt Concrete Renewal

Devon

Completed comprehensive concrete works to this petrol station forecourt, including excavation, ground preparation, reinforcement, new concrete slabs, jointing, drainage integration, finishing, curing and reinstatement.

ACO channel drainage installed flush within a new tarmac surface

ACO Drainage Installation

Milton Keynes

Installation complete of an ACO channel drainage system within a tarmac surface, providing effective surface water management, improved drainage performance and a durable finish suitable for commercial vehicle areas.

Stainless steel bollards and electrical utility cabinet in a landscaped verge beside block paving

Bollard and Utility Installation

Cambridge

Installation of stainless steel protective bollards and electrical utility equipment within a landscaped verge, providing secure cable protection, improved site safety, and a clean durable finish alongside block paving, ready for EV install.

Purpose built reinforced equipment base with galvanised protective edging and central service opening

Reinforced Equipment Base

Warwick

Installation complete of a bespoke durable, purpose built equipment base for HGV use with protective edging and a central service opening, providing a robust, clean and safe foundation for future site infrastructure and ready for equipment install.

Recessed cable management ducting run set flush into a new concrete surface

Accessible Cable Management

Wiltshire

Installation of a durable cable management system within this industrial site in Wiltshire, providing protected cable routing, improved site safety and a seamless finish, accessible cable management alongside the new concrete surface.

New concrete kerbs curving alongside fresh tarmac on a residential development

New Build Kerb Installation

Gloucester

Installation complete of new concrete kerbs throughout this new build residential development, creating clean road edges, defined landscaping areas and a durable finish to support the new estate infrastructure and ready for move in dates.

Free quotation

Get in touch

Send us the site and the scope. We'll survey it at no cost and come back with a fixed, no obligation quotation, on the same day.

  • Free site survey, no obligation
  • Fixed price against a written scope
  • Same working day reply

Prefer to talk? 0203 908 0035

Request your quote

Tell us the site and what needs doing — we'll do the rest.

We'll only use your details to reply. See our privacy policy.

Common questions

Do we need an asbestos survey first?

For any structure built before 2000, yes — a refurbishment and demolition survey. We will not break out anything without knowing what is in it, and licensed removal is arranged where needed.

Can material be reused rather than carted away?

Usually. Crushed concrete and brick make good fill, which saves both disposal and imported stone. It is normally the single biggest saving available on a demolition job.

Can you demolish next to a live building?

Yes, with the right method, protection and monitoring. We plan it rather than improvising, particularly where there are shared walls or services.

Do you have your own plant and operators?

Yes. Excavators, dumpers, rollers, breakers and attachments are ours, operated by directly employed teams, so we mobilise quickly rather than waiting on hire company availability.

Can you work on a live, occupied site?

Most of our work is on operational sites. We phase the works, segregate properly, plan traffic management around deliveries and pedestrians, and work nights or weekends where that is what it takes.

Is a site survey and quotation free?

Yes. Surveys and quotations are free and carry no obligation. We normally survey within a few working days and return a fixed price against a written scope on the same day.

Do you cover the whole of the UK?

Yes, and Ireland. Regional teams cover single sites and national portfolios, including multi site civils programmes running simultaneously across several regions.

Get an instant quote today

Tell us what needs removing. We'll survey it free of charge and come back with a fixed, no obligation price.

Call now Free quote