VCNY Group Limited 0203 908 0035 Free quote

Concrete Slabs & Bases

Concrete Slabs & Bases

Machine bases, plant bases, floor slabs and external hardstanding — sized for the load, jointed so they do not crack, and finished for the use.

  • Machine, plant and equipment bases
  • Joints positioned to control cracking
  • Power float and textured finishes
  • Free site survey and a fixed price against a written scope
  • Own plant, own teams, no subcontract chain
  • Setting out, test records and as built information

Get your free quote

Free survey. Fixed price. No obligation. We reply the same working day.

Or call 0203 908 0035 — answered 24/7

We'll only use your details to reply. See our privacy policy.

Trusted by leading businesses across the UK and Ireland

Amazon McDonalds Greggs Holland and Barrett Holiday Inn Express Brewers Village Hotel Club Pets Corner

What Concrete Slabs & Bases covers

Design coordinationWorking to your engineer's or supplier's base requirements including bolt positions.
Formation and sub basePrepared, compacted and proof rolled before any reinforcement is placed.
Reinforcement and fixingsMesh, bars, holding down bolts and cast in items positioned accurately.
Pouring and finishingPlaced, levelled, floated or textured to suit the intended use.
Joints and sealantsMovement and saw cut joints positioned and sealed properly.
Curing and handoverProtected while curing, then handed over with pour and cube records.

Need this sorted quickly?

Leave a number and we'll call you straight back, or call us now, any hour of the day.

Or call 0203 908 0035

Why clients hand us the whole site

Groundworks set the levels every trade after you works to. Getting them right, and getting them right first time, is what keeps a programme intact.

1hr

Rapid response

Operatives on site within the hour for genuine emergencies, anywhere in the UK.

24/7

Always answered

A real person on the phone at any hour, every day of the year.

28+

Years of experience

Combined industry experience across groundworks, drainage and concrete.

1

Point of contact

One named contact from first survey through to final sign off.

How it works

No drawn out procurement. Most jobs go from first call to a priced scope inside a week.

Step 1

Call or send the drawings

Tell us the site and the scope. Send an engineer's drawing if you have one; a description is enough if you do not.

Step 2

Free survey and fixed price

We walk the site, check levels and services, then quote a fixed price against a written scope, on the same day.

Step 3

Built and documented

Delivered by our own teams and plant, then handed over with setting out records, test results and as built information.

Recent civil engineering

Trenching, drainage, concrete, kerbing and hardstanding delivered across the UK by the same teams and the same plant.

8 recent projects
VCNY mini excavator breaking out a trench for EV charging bay cable routes

Trenching Works

Birmingham

Trenching project for new EV charging bays, including excavation, cable routes, duct installation, bedding, backfilling, reinstatement, electrical infrastructure preparation, surface repairs and coordination for future charging point installations.

Open trench with new underground ducting laid, heras fencing alongside

Ducting Installation

Swansea

Trench excavation and installation of new underground ducting, including ground preparation, bedding, duct positioning, alignment, protection, temporary safety measures, backfilling preparation and reinstatement works.

Newly laid concrete forecourt slabs at a petrol station with drainage channel

Forecourt Concrete Renewal

Devon

Completed comprehensive concrete works to this petrol station forecourt, including excavation, ground preparation, reinforcement, new concrete slabs, jointing, drainage integration, finishing, curing and reinstatement.

ACO channel drainage installed flush within a new tarmac surface

ACO Drainage Installation

Milton Keynes

Installation complete of an ACO channel drainage system within a tarmac surface, providing effective surface water management, improved drainage performance and a durable finish suitable for commercial vehicle areas.

Stainless steel bollards and electrical utility cabinet in a landscaped verge beside block paving

Bollard and Utility Installation

Cambridge

Installation of stainless steel protective bollards and electrical utility equipment within a landscaped verge, providing secure cable protection, improved site safety, and a clean durable finish alongside block paving, ready for EV install.

Purpose built reinforced equipment base with galvanised protective edging and central service opening

Reinforced Equipment Base

Warwick

Installation complete of a bespoke durable, purpose built equipment base for HGV use with protective edging and a central service opening, providing a robust, clean and safe foundation for future site infrastructure and ready for equipment install.

Recessed cable management ducting run set flush into a new concrete surface

Accessible Cable Management

Wiltshire

Installation of a durable cable management system within this industrial site in Wiltshire, providing protected cable routing, improved site safety and a seamless finish, accessible cable management alongside the new concrete surface.

New concrete kerbs curving alongside fresh tarmac on a residential development

New Build Kerb Installation

Gloucester

Installation complete of new concrete kerbs throughout this new build residential development, creating clean road edges, defined landscaping areas and a durable finish to support the new estate infrastructure and ready for move in dates.

Free quotation

Get in touch

Send us the site and the scope. We'll survey it at no cost and come back with a fixed, no obligation quotation, on the same day.

  • Free site survey, no obligation
  • Fixed price against a written scope
  • Same working day reply

Prefer to talk? 0203 908 0035

Request your quote

Tell us the site and what needs doing — we'll do the rest.

We'll only use your details to reply. See our privacy policy.

Common questions

How accurate can holding down bolts be set?

Within a few millimetres using templates supplied or fabricated to the equipment drawings. Getting this wrong is expensive, so we set from templates rather than measurements.

How thick should a slab be?

It depends entirely on the loading, the sub grade and whether it is internal or external. We will size it against the actual use rather than defaulting to a standard thickness.

When can equipment be installed on a new base?

Usually seven days for light loading and 28 days for full design load, though rapid strength mixes can shorten that where the programme is tight.

Do you have your own plant and operators?

Yes. Excavators, dumpers, rollers, breakers and attachments are ours, operated by directly employed teams, so we mobilise quickly rather than waiting on hire company availability.

Can you work on a live, occupied site?

Most of our work is on operational sites. We phase the works, segregate properly, plan traffic management around deliveries and pedestrians, and work nights or weekends where that is what it takes.

Is a site survey and quotation free?

Yes. Surveys and quotations are free and carry no obligation. We normally survey within a few working days and return a fixed price against a written scope on the same day.

Do you cover the whole of the UK?

Yes, and Ireland. Regional teams cover single sites and national portfolios, including multi site civils programmes running simultaneously across several regions.

Get an instant quote today

Send us the base requirement or equipment drawing. We'll survey the site free of charge and come back with a fixed price.

Call now Free quote